Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
2007 ◽
Vol 54
(6)
◽
pp. 602-614
◽
2005 ◽
Vol 56
(2)
◽
pp. 161-168
◽
Keyword(s):
Keyword(s):
2005 ◽
Vol 54
(2)
◽
pp. 304-309
◽
2013 ◽
Vol 51
(3)
◽
pp. 847-868
◽
2010 ◽
Vol 50
(1-4)
◽
pp. 365-375
◽
Keyword(s):
2007 ◽
Vol 13
(1)
◽
pp. 49-61
◽
Keyword(s):
2007 ◽
Vol 39
(9-10)
◽
pp. 954-964
◽
2015 ◽
Vol 2015
◽
pp. 1-9
◽
2012 ◽
Vol 50
(13)
◽
pp. 3643-3660
◽