Evaluation of the state of the dam and rock foundation of the Zeya hydroelectric station

1999 ◽  
Vol 33 (5) ◽  
pp. 313-319
Author(s):  
V. I. Sil’nitskii ◽  
V. A. Ulyashinskii
1987 ◽  
Vol 21 (9) ◽  
pp. 552-558 ◽  
Author(s):  
O. N. Nosova ◽  
L. G. Egorova ◽  
I. �. Shakars ◽  
V. M. Yaunzema

2018 ◽  
Vol 196 ◽  
pp. 02005
Author(s):  
Alexey Romanov ◽  
Sergey Evdokimov ◽  
Alla Orlova

Nowadays, the state of Zhiguli Hydroelectric Station (HS) and its main hydraulic structures is controlled by observation of control and measuring equipment installed on these structures. There are systematic inspections and surveys carried out by both the hydroelectric power station personnel and by invited experts. The last analysis of the state of HS and its hydraulic structures was made in 1991. Since that time, a computer-based information and diagnostic system for monitoring the state of hydraulic structures has been introduced at HS. This system introduction caused the need to pay more serious attention to the reliability of the results obtained by means of control and measuring equipment, because the system monitored the condition of all hydraulic structures according to these results. Thus, the purpose of the research is to perform a multi-factor analysis of HS state and its hydraulic structures according to field studies results of all the devices installed in water-retaining structures. The results show impervious elements of HS underground circuit are not effective enough for specific geological conditions in terms of clearing the filtration head. The main drop of water head in the base occurs on HS building upper cutoff, i.e. in this zone there is a maximum filtration gradient, which is very dangerous. This process should be carefully monitored. It was revealed that several piezometers in the base do not work or their indications are not reliable, therefore it is necessary to repair and, in some cases, replace them. In future, it is necessary to equip main piezometers of HS with remote water level measuring sets and to make an automated system of condition monitoring.


1981 ◽  
Vol 15 (8) ◽  
pp. 459-461 ◽  
Author(s):  
A. E. Azarkovich ◽  
M. I. Shuifer ◽  
A. I. Tsvetkov ◽  
S. S. Gandzyuk ◽  
E. L. Budnikov

2013 ◽  
Vol 438-439 ◽  
pp. 845-848
Author(s):  
Ke Dong Tang ◽  
Lin Xiao Liang

ndependent evaluation of immigrants is conducted by independent and impartial monitoring mechanisms or synthetical supervision units to evaluate the results of resettlement and implementation of migrants lawful rights and interests, in order to get the information completely and objectively. According to the complete survey on the spot of migrants level of productive employment around the Shimenkan hydroelectric station at March 2012, and linking with the development of local society and economy, objective assessment was given to evaluate the state of resettlement, resumption of living standard and social adaptation. This paper sums up the experience and gives suggestions to the problems on this resettlement planning. At the implementation of the planning stage, resettlement points which were planned at the research phase were cancelled after investigating the remainder resources around reservoir and listening to the migrants opinions. Settling the problem right on the spot was chose to replace relocation. The plan after optimizing and adjusting was successful by way of practice.


Sign in / Sign up

Export Citation Format

Share Document