Uncapacitated lot-sizing: The convex hull of solutions

Author(s):  
Imre Barany ◽  
Tony Roy ◽  
Laurence A. Wolsey
Keyword(s):  
2011 ◽  
Vol 8 (2) ◽  
pp. 385-392 ◽  
Author(s):  
Dinakar Gade ◽  
Simge Küçükyavuz
Keyword(s):  

2007 ◽  
Vol 118 (1) ◽  
pp. 151-175 ◽  
Author(s):  
Simge Küçükyavuz ◽  
Yves Pochet
Keyword(s):  

2016 ◽  
Vol 28 (4) ◽  
pp. 766-780 ◽  
Author(s):  
Kerem Akartunalı ◽  
Ioannis Fragkos ◽  
Andrew J. Miller ◽  
Tao Wu
Keyword(s):  

2004 ◽  
Vol 1 (2) ◽  
pp. 189-203 ◽  
Author(s):  
M. Van Vyve ◽  
F. Ortega
Keyword(s):  

2007 ◽  
Author(s):  
Simge Küçükyavuz ◽  
Yves Pochet
Keyword(s):  

1989 ◽  
Vol 136 (6) ◽  
pp. 530
Author(s):  
G.R. Wilson ◽  
B.G. Batchelor
Keyword(s):  

2019 ◽  
Vol 4 (2) ◽  
pp. 205-214
Author(s):  
Erika Fatma

Lot sizing problem in production planning aims to optimize production costs (processing, setup and holding cost) by fulfilling demand and resources capacity costraint. The Capacitated Lot sizing Problem (CLSP) model aims to balance the setup costs and inventory costs to obtain optimal total costs. The object of this study was a plastic component manufacturing company. This study use CLSP model, considering process costs, holding costs and setup costs, by calculating product cycle and setup time. The constraint of this model is the production time capacity and the storage capacity of the finished product. CLSP can reduce the total production cost by 4.05% and can reduce setup time by 46.75%.  Keyword: Lot size, CLSP, Total production cost.


2019 ◽  
Vol 31 (5) ◽  
pp. 761
Author(s):  
Xiao Lin ◽  
Zuxiang Liu ◽  
Xiaomei Zheng ◽  
Jifeng Huang ◽  
Lizhuang Ma

Sign in / Sign up

Export Citation Format

Share Document