On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
1999 ◽
Vol 119
(2)
◽
pp. 538-556
◽
2019 ◽
Vol 145
(3)
◽
pp. 04018142
◽
1998 ◽
Vol 25
(1)
◽
pp. 1-17
◽
1998 ◽
Vol 111
(1)
◽
pp. 152-174
◽
2011 ◽
Vol 38
(1)
◽
pp. 14-20
◽
2017 ◽
Vol 11
(6)
◽
pp. 774
◽