Condition of the Gotsatli Hydroelectric Power Plant Dam During Filling of the Reservoir According to Field Observations and Numerical Modeling
Keyword(s):
2014 ◽
Vol 36
(1)
◽
pp. 53-60
◽
Keyword(s):
2017 ◽
Vol 23
(1)
◽
pp. 71-85
◽
2002 ◽
Vol 122
(6)
◽
pp. 989-994
Keyword(s):
1989 ◽
Vol 26
(2)
◽
pp. 82
Keyword(s):