Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
2017 ◽
Vol 6
(3)
◽
pp. 26-36
1966 ◽
Vol 20
(1)
◽
pp. 43-69
◽
2009 ◽
Vol 18
(4)
◽
pp. 459-474
◽
2000 ◽
Vol 64
(1-3)
◽
pp. 153-164
◽