scholarly journals A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations

2015 ◽  
Vol 19 (4) ◽  
pp. 409-428 ◽  
Author(s):  
Patricio Lamas ◽  
Erik Demeulemeester
2013 ◽  
Vol 61 (4) ◽  
pp. 1005-1015 ◽  
Author(s):  
M. Klimek ◽  
P. Łebkowski

Abstract The paper presents the resource-constrained project scheduling with cash flow optimisation. New project models with bonuspenalty system and payoff in stages have been proposed. For the models presented, the application of proactive scheduling is analysed, as designed to improve project execution under uncertainty. Next, schedule robustness is discussed and measures of robustness are proposed.