Minimizing maximum tardiness and delivery costs with batch delivery and job release times
2015 ◽
Vol 39
(16)
◽
pp. 4909-4927
◽
2010 ◽
Vol 123
(1)
◽
pp. 235-242
◽
Keyword(s):
2014 ◽
Vol 31
(06)
◽
pp. 1450044
◽
A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times
2008 ◽
Vol 35
(4)
◽
pp. 1099-1111
◽
2000 ◽
Vol 68
(2)
◽
pp. 177-183
◽
Keyword(s):
2015 ◽
Vol 53
◽
pp. 194-205
◽
Keyword(s):
A branch-and-bound algorithm for two-machine flow-shop scheduling problems with batch delivery costs
2014 ◽
Vol 1
(2)
◽
pp. 94-104