scholarly journals Extended formulation and valid inequalities for the multi-item inventory lot-sizing problem with supplier selection

2021 ◽  
Vol 130 ◽  
pp. 105234
Author(s):  
Leopoldo E. Cárdenas-Barrón ◽  
Rafael A. Melo ◽  
Marcio C. Santos
Author(s):  
Carlos E Testuri ◽  
Héctor Cancela ◽  
Víctor M. Albornoz

A multistage stochastic capacitated discrete procurement problem with lead times, cancellation and postponement is addressed.  The problem determines the procurement of a product under uncertain demand at minimal expected cost during a time horizon.  The supply of the product is made through the purchase of optional distinguishable orders of fixed size with delivery time.  Due to the unveiling of uncertainty over time it is possible to make cancellation and postponement corrective decisions on order procurement.  These decisions involve costs and times of implementation.  A model of the problem is formulated as an extension of a discrete capacitated lot-sizing problem under uncertain demand and lead times through a multi-stage stochastic mixed-integer linear programming approach.  Valid inequalities are generated, based on a conventional inequalities approach, to tighten the model formulation.  Experiments are performed for several problem instances with different uncertainty information structure.  Their results allow to conclude that the incorporation of a subset of the generated inequalities favor the model solution.


1995 ◽  
Vol 22 (7) ◽  
pp. 669-680 ◽  
Author(s):  
Alistair Richard Clark ◽  
Vinicius Amaral Armentano

Sign in / Sign up

Export Citation Format

Share Document