Longitudinal dynamics study and optimization in the beam commissioning of the rapid cycling synchrotron in the China Spallation Neutron Source
Keyword(s):
Keyword(s):
2013 ◽
Vol 25
(10)
◽
pp. 2671-2674
◽
Keyword(s):
Keyword(s):
2009 ◽
Vol 12
(4)
◽
Keyword(s):