Delayed-hydride cracking (DHC) of cladding materials: An analysis for storage and disposal of spent nuclear fuel

2019 ◽  
Vol 350 ◽  
pp. 128-136
Author(s):  
Tae M. Ahn
2006 ◽  
Vol 985 ◽  
Author(s):  
Yi-Ming Pan ◽  
K. S. Chan ◽  
D. S. Riha

AbstractCladding failure of fuel rods caused by hydride-induced embrittlement is a reliability concern for spent nuclear fuel after extended burnup. Uncertainties in the cladding temperature, cladding stress, oxide layer thickness, and the critical stress value for hydride reorientation preclude an assessment of the cladding failure risk. A set of micromechanical models for treating oxide cracking, blister cracking, delayed hydride cracking, and cladding fracture was developed and incorporated in a computer model. Results obtained from the model calculations indicate that at temperatures below a critical temperature of 318.5 °C [605.3 °F], the time to failure by delayed hydride cracking in Zr-2.5%Nb decreased with increasing cladding temperature. The overall goal of this project is to develop a probabilistic-micromechanical methodology for assessing the probability of hydride-induced failure in Zircaloy cladding and thereby establish performance criteria.


2002 ◽  
Author(s):  
Glenn E. McCreery ◽  
Keith G. Condie ◽  
Randy C. Clarksean ◽  
Donald M. McEligot

2020 ◽  
Vol 2020 (1) ◽  
pp. 67-77
Author(s):  
Nikita Vladimirivich Kovalyov ◽  
Boris Yakovlevich Zilberman ◽  
Nikolay Dmitrievich Goletskiy ◽  
Andrey Borisovich Sinyukhin

ANRI ◽  
2020 ◽  
pp. 45-53
Author(s):  
A. Lachugin ◽  
M. Kocherygin ◽  
A. Gayazov ◽  
Yury Martynyuk ◽  
A. Vasil'ev

The paper presents basic results of development of a criticality accident alarm system to ensure safe retrieval of the spent nuclear fuel from the Lepse Floating Maintenance Base. The key features and engineering aspects of the system design are described. Locations of criticality detector units and selected alarm level settings are justified, hazardous area boundaries were identified, and parameters to identify inadequately protected zones were calculated. The SRKS-01D criticality accident alarm system by SPC “Doza” was selected as base equipment. The system was commissioned in 2019 and has been successfully operated for more than 6 months.


2018 ◽  
Author(s):  
Kaushik Banerjee ◽  
Thomas M. Evans ◽  
Gregory G. Davidson ◽  
Steven P. Hamilton

2020 ◽  
Author(s):  
Benjamin Roach ◽  
Cole Hexel ◽  
Kayron Rogers ◽  
Jeffrey (Jeff) Delashmitt ◽  
Shalina Metzger ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document