scholarly journals Rules of Risk Management - Case Study of Open Pit Mine

2020 ◽  
Vol 28 ◽  
pp. 764-769
Author(s):  
Snezana Kirin ◽  
Wei Li ◽  
Miodrag Brzaković ◽  
Igor Miljanović ◽  
Aleksandar Sedmak
Author(s):  
Snezana Kirin ◽  
Aleksandar Sedmak ◽  
Wei Li ◽  
Miodrag Brzaković ◽  
Igor Miljanović ◽  
...  

2012 ◽  
Vol 5 (3) ◽  
Author(s):  
Mina Elmaallam ◽  
Abdelaziz Kriouile

2011 ◽  
Vol 243-249 ◽  
pp. 6362-6368
Author(s):  
Yan Zhang ◽  
Chang Jiang Liu

In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.


Sign in / Sign up

Export Citation Format

Share Document