Minimizing the expected number of tardy jobs when processing times are normally distributed

2002 ◽  
Vol 30 (2) ◽  
pp. 100-106 ◽  
Author(s):  
Wooseung Jang ◽  
Cerry M. Klein
1991 ◽  
Vol 23 (04) ◽  
pp. 909-924 ◽  
Author(s):  
Rhonda Righter ◽  
Susan H. Xu

We consider the problem of scheduling n jobs non-preemptively on m parallel, non-identical processors to minimize a weighted expected cost function of job completion times, where the weights are associated with the jobs. The cost function is assumed to be increasing and concave but otherwise arbitrary. Processing times are IFR with different distributions for different processors. Jobs may be processed on any processor and there are no precedences. We show that the optimal policy orders the jobs in decreasing order of their weights and then uses the individually optimal policy for each job. In other words, processors are offered to jobs in order, and each job considers its own expected cost function for its completion time to decide whether to accept or reject a processor. Therefore, the optimal policy does not depend on the weights of the jobs except through their order. Special cases of our objective function are weighted expected flowtime, weighted discounted expected flowtime, and weighted expected number of tardy jobs.


1991 ◽  
Vol 23 (4) ◽  
pp. 909-924 ◽  
Author(s):  
Rhonda Righter ◽  
Susan H. Xu

We consider the problem of scheduling n jobs non-preemptively on m parallel, non-identical processors to minimize a weighted expected cost function of job completion times, where the weights are associated with the jobs. The cost function is assumed to be increasing and concave but otherwise arbitrary. Processing times are IFR with different distributions for different processors. Jobs may be processed on any processor and there are no precedences. We show that the optimal policy orders the jobs in decreasing order of their weights and then uses the individually optimal policy for each job. In other words, processors are offered to jobs in order, and each job considers its own expected cost function for its completion time to decide whether to accept or reject a processor. Therefore, the optimal policy does not depend on the weights of the jobs except through their order. Special cases of our objective function are weighted expected flowtime, weighted discounted expected flowtime, and weighted expected number of tardy jobs.


2013 ◽  
Vol 2013 ◽  
pp. 1-9 ◽  
Author(s):  
Jianbo Qian ◽  
George Steiner

We consider single machine scheduling problems with learning/deterioration effects and time-dependent processing times, with due date assignment consideration, and our objective is to minimize the weighted number of tardy jobs. By reducing all versions of the problem to an assignment problem, we solve them inO(n4) time. For some important special cases, the time complexity can be improved to beO(n2) using dynamic programming techniques.