Evaluation of the potential benefits of lot streaming in flow-shop systems
2000 ◽
Vol 66
(2)
◽
pp. 131-142
◽
Keyword(s):
2009 ◽
Vol 19
(2)
◽
pp. 267-282
◽
Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
2002 ◽
Vol 29
(10)
◽
pp. 1301-1315
◽
Keyword(s):
The Mean
◽
Keyword(s):
2011 ◽
pp. 576-583
2008 ◽
Vol 24
(1)
◽
pp. 125-139
◽
2001 ◽
Vol 32
(2)
◽
pp. 387-398
◽