scholarly journals The ASTRI Program

2019 ◽  
Vol 209 ◽  
pp. 01001
Author(s):  
Salvatore Scuderi

The ASTRI (Astrofisica con Specchi a Tecnologia Replicante Italiana) program was born as a collaborative international effort led by the Italian National Institute for Astrophysics (INAF) to design and realize, within the Cherenkov Telescope Array (CTA) framework, an end-to-end prototype of the Small-Sized Telescope (SST) in a dual-mirror configuration (2M). While the activities concerning the characterization of the prototype are under completion, the program entered a new phase. With the final aim of contributing at the production of the SST telescopes for the CTAO Southern site, we started the development of nine telescopes based on the evolution of the ASTRI prototype design to work as pathfinder for the CTAO. Furthermore, together with the CHEC (Compact High Energy Camera) collaboration, the ASTRI team presented a proposal, that will be evaluated with other proposals, to deliver to CTAO the complete set of SST telescopes.

2008 ◽  
Author(s):  
S. Funk ◽  
J. A. Hinton ◽  
Felix A. Aharonian ◽  
Werner Hofmann ◽  
Frank Rieger

2021 ◽  
Vol 251 ◽  
pp. 02029
Author(s):  
Luisa Arrabito ◽  
Johan Bregeon ◽  
Patrick Maeght ◽  
Michèle Sanguillon ◽  
Andrei Tsaregorodtsev ◽  
...  

The Cherenkov Telescope Array (CTA) is the next-generation instrument in the very-high energy gamma ray astronomy domain. It will consist of tens of Cherenkov telescopes deployed in 2 arrays at La Palma (Spain) and Paranal (ESO, Chile) respectively. Currently under construction, CTA will start operations around 2023 for a duration of about 30 years. During operations CTA is expected to produce about 2 PB of raw data per year plus 5-20 PB of Monte Carlo data. The global data volume to be managed by the CTA archive, including all versions and copies, is of the order of 100 PB with a smooth growing profile. The associated processing needs are also very high, of the order of hundreds of millions of CPU HS06 hours per year. In order to optimize the instrument design and study its performances, during the preparatory phase (2010-2017) and the current construction phase, the CTA consortium has run massive Monte Carlo productions on the EGI grid infrastructure. In order to handle these productions and the future data processing, we have developed a production system based on the DIRAC framework. The current system is the result of several years of hardware infrastructure upgrades, software development and integration of different services like CVMFS and FTS. In this paper we present the current status of the CTA production system and its exploitation during the latest large-scale Monte Carlo campaigns.


2021 ◽  
Author(s):  
Barbara Patricelli ◽  
Alessandro Carosi ◽  
Lara Nava ◽  
Monica Seglar-Arroyo ◽  
Fabian Schüssler ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document