Optimization of Upstream and Downstream Controls for Sanitary Sewer Overflows

Author(s):  
Leonard Wright ◽  
James P. Heaney ◽  
Shawn Dent ◽  
Charles Mosley
2009 ◽  
Vol 2009 (2) ◽  
pp. 532-561
Author(s):  
Christopher J. Tippery ◽  
Craig Schuenemann ◽  
Pei-Chih Chiang ◽  
Thomas J. Nejedlo

2004 ◽  
Vol 2004 (5) ◽  
pp. 378-385 ◽  
Author(s):  
Julia Moore ◽  
Cynthia Valente ◽  
Michael Sullivan ◽  
Kevin DeBell

1999 ◽  
Vol 2 (3) ◽  
pp. 121-130
Author(s):  
I. Y. Georgiou ◽  
M. E. Tittlebaum

2015 ◽  
Vol 10 (2) ◽  
pp. 282-290 ◽  
Author(s):  
V. Nasri ◽  
C. E. Haynes

The South Hartford Conveyance and Storage Tunnel is a major component of Hartford Metropolitan District's Clean Water Project. It is intended to capture and store combined sewer overflows from the southern portion of Hartford, CT, and sanitary sewer overflows from West Hartford and Newington, CT. The project is estimated to cost approximately $US500 M and will be constructed under multiple construction contracts. The project components include a deep rock tunnel 6.6 km long and 7.6 m excavated diameter, several kilometers of consolidation sewers, multiple hydraulic drop shafts with deaeration chambers and a 100 MLD pumping station for tunnel dewatering. The tunnel boring machine-bored tunnel will be excavated in shale, siltstone and basalt through several fault zones. An AECOM led team is currently performing the final design for the project.


2001 ◽  
Vol 2001 (2) ◽  
pp. 163-174
Author(s):  
Philip M. Hannan ◽  
Richard E. Nelson ◽  
Ahmad Habibian

Sign in / Sign up

Export Citation Format

Share Document