Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity
2015 ◽
Vol 54
(12)
◽
pp. 3475-3490
◽
Keyword(s):
2013 ◽
Vol 344
◽
pp. 290-293
2014 ◽
Vol 644-650
◽
pp. 2026-2029
Keyword(s):
2013 ◽
Vol 344
◽
pp. 275-278
Keyword(s):
2015 ◽
Vol 57
◽
pp. 33-40
◽
2020 ◽
Vol 2020
◽
pp. 1-7
◽
2021 ◽
Vol 290
(2)
◽
pp. 453-468
2009 ◽
Vol 36
(9)
◽
pp. 2541-2545
◽
2014 ◽
Vol 31
(05)
◽
pp. 1450036
◽