Distribution-Free Phase I Control Charts for Subgroup Location

2009 ◽  
Vol 41 (3) ◽  
pp. 304-316 ◽  
Author(s):  
L. Allison Jones-Farmer ◽  
Victoria Jordan ◽  
Charles W. Champ
Author(s):  
Hourieh Foroutan ◽  
Amirhossein Amiri ◽  
Reza Kamranrad

In most statistical process control (SPC) applications, quality of a process or product is monitored by univariate or multivariate control charts. However, sometimes a functional relationship between a response variable and one or more explanatory variables is established and monitored over time. This relationship is called “profile” in SPC literature. In this paper, we specifically consider processes with compositional data responses, including multivariate positive observations summing to one. The relationship between compositional data responses and explanatory variables is modeled by a Dirichlet regression profile. We develop a monitoring procedure based on likelihood ratio test (lrt) for Phase I monitoring of Dirichlet regression profiles. Then, we compare the performance of the proposed method with the best method in the literature in terms of probability of signal. The results of simulation studies show that the proposed control chart has better performance in Phase I monitoring than the competing control chart. Moreover, the proposed method is able to estimate the real time of a change as well. The performance of this feature is also investigated through simulation runs which show the satisfactory performance. Finally, the application of the proposed method is illustrated based on a real case in comparison with the existing method.


Mathematics ◽  
2020 ◽  
Vol 8 (5) ◽  
pp. 857 ◽  
Author(s):  
Ishaq Adeyanju Raji ◽  
Muhammad Hisyam Lee ◽  
Muhammad Riaz ◽  
Mu’azu Ramat Abujiya ◽  
Nasir Abbas

Shewhart control charts with estimated control limits are widely used in practice. However, the estimated control limits are often affected by phase-I estimation errors. These estimation errors arise due to variation in the practitioner’s choice of sample size as well as the presence of outlying errors in phase-I. The unnecessary variation, due to outlying errors, disturbs the control limits implying a less efficient control chart in phase-II. In this study, we propose models based on Tukey and median absolute deviation outlier detectors for detecting the errors in phase-I. These two outlier detection models are as efficient and robust as they are distribution free. Using the Monte-Carlo simulation method, we study the estimation effect via the proposed outlier detection models on the Shewhart chart in the normal as well as non-normal environments. The performance evaluation is done through studying the run length properties namely average run length and standard deviation run length. The findings of the study show that the proposed design structures are more stable in the presence of outlier detectors and require less phase-I observation to stabilize the run-length properties. Finally, we implement the findings of the current study in the semiconductor manufacturing industry, where a real dataset is extracted from a photolithography process.


2015 ◽  
Vol 86 (1-4) ◽  
pp. 723-735 ◽  
Author(s):  
J. C. Malela-Majika ◽  
S. Chakraborti ◽  
M. A. Graham

2008 ◽  
Vol 35 (1) ◽  
pp. 67-87 ◽  
Author(s):  
Gülser Köksal ◽  
Burcu Kantar ◽  
Taylan Ali Ula ◽  
Murat Caner Testik

2014 ◽  
Vol 31 (8) ◽  
pp. 1705-1716 ◽  
Author(s):  
Saddam Akber Abbasi ◽  
Muhammad Riaz ◽  
Arden Miller ◽  
Shabbir Ahmad

Sign in / Sign up

Export Citation Format

Share Document