Heuristic methods for the single machine scheduling problem with different ready times and a common due date

2012 ◽  
Vol 44 (10) ◽  
pp. 1197-1208 ◽  
Author(s):  
Ernesto G. Birgin ◽  
Débora P. Ronconi
2003 ◽  
Vol 30 (8) ◽  
pp. 1173-1185 ◽  
Author(s):  
C.T.Daniel Ng ◽  
T.C.Edwin Cheng ◽  
Mikhail Y. Kovalyov ◽  
S.S. Lam

Sign in / Sign up

Export Citation Format

Share Document