Genetic algorithm to production planning and scheduling problems for manufacturing systems

2000 ◽  
Vol 11 (5) ◽  
pp. 443-458 ◽  
Author(s):  
K. F. Man ◽  
K. S. Tang ◽  
S. Kwong ◽  
W. H. Ip
2020 ◽  
Vol 7 (6) ◽  
pp. 761-774
Author(s):  
Kailash Changdeorao Bhosale ◽  
Padmakar Jagannath Pawar

Abstract Production planning and scheduling problems are highly interdependent as scheduling provides optimum allocation of resources and planning is an optimum utilization of these allocated resources to serve multiple customers. Researchers have solved production planning and scheduling problems by the sequential method. But, in this case, the solution obtained by the production planning problem may not be feasible for scheduling method. Hence, production planning and scheduling problems must be solved simultaneously. Therefore, in this work, a mathematical model is developed to integrate production planning and scheduling problems. The solution to this integrated planning and scheduling problem is attempted by using a discrete artificial bee colony (DABC) algorithm. To speed up the DABC algorithm, a k-means clustering algorithm is used in the initial population generation phase. This k-means clustering algorithm will help to converge the algorithm in lesser time. A real-life case study of a soap manufacturing industry is presented to demonstrate the effectiveness of the proposed approach. An objective function to minimize overall cost, which comprises the processing cost, material cost, utility cost, and changeover cost, is considered. The results obtained by using DABC algorithm are compared with those obtained by CPLEX software. There is a saving of ₹2 23 324 for weeks 1–4 in overall cost compared with the results obtained by using CPLEX software.


2022 ◽  
pp. 1-18
Author(s):  
Nan-Yun Jiang ◽  
Hong-Sen Yan

For the fixed-position assembly workshop, the integrated optimization problem of production planning and scheduling in the uncertain re-entrance environment is studied. Based on the situation of aircraft assembly workshops, the characteristics of fixed-position assembly workshop with uncertain re-entrance are abstracted. As the re-entrance repetition obeys some type of probability distribution, the expected value is used to describe the repetition, and a bi-level stochastic expected value programming model of integrated production planning and scheduling is constructed. Recursive expressions for start time and completion time of assembly classes and teams are confirmed. And the relation between the decision variable in the lower-level model of scheduling and the overtime and earliness of assembly classes and teams in the upper-level model of production planning is identified. Addressing the characteristics of bi-level programming model, an alternate iteration method based on Improved Genetic Algorithm (AI-IGA) is proposed to solve the models. Elite Genetic Algorithm (EGA) is introduced for the upper-level model of production planning, and Genetic Simulated Annealing Algorithm based on Stochastic Simulation Technique (SS-GSAA) is developed for the lower-level model of scheduling. Results from our experiments demonstrate that the proposed method is feasible for production planning and optimization of the fixed-position assembly workshop with uncertain re-entrance. And algorithm comparison verifies the effectiveness of the proposed algorithm.


Sign in / Sign up

Export Citation Format

Share Document