scholarly journals Integer linear programming outperforms simulated annealing for solving conservation planning problems

2019 ◽  
Author(s):  
Richard Schuster ◽  
Jeffrey O. Hanson ◽  
Matt Strimas-Mackey ◽  
Joseph R. Bennett

AbstractThe resources available for conserving biodiversity are limited, and so protected areas need to be established in places that will achieve objectives for minimal cost. Two of the main algorithms for solving systematic conservation planning problems are Simulated Annealing (SA) and Integer linear programming (ILP). Using a case study in British Columbia, Canada, we compare the cost-effectiveness and processing times of SA versus ILP using both commercial and open-source algorithms. Plans for expanding protected area systems based on ILP algorithms were 12 to 30% cheaper than plans using SA. The best ILP solver we examined was on average 1071 times faster than the SA algorithm tested. The performance advantages of ILP solvers were also observed when we aimed for spatially compact solutions by including a boundary penalty. One practical advantage of using ILP over SA is that the analysis does not require calibration, saving even more time. Given the performance of ILP solvers, they can be used to generate conservation plans in real-time during stakeholder meetings and can facilitate rapid sensitivity analysis, and contribute to a more transparent, inclusive, and defensible decision-making process.

PeerJ ◽  
2020 ◽  
Vol 8 ◽  
pp. e9258
Author(s):  
Richard Schuster ◽  
Jeffrey O. Hanson ◽  
Matthew Strimas-Mackey ◽  
Joseph R. Bennett

The resources available for conserving biodiversity are limited, and so protected areas need to be established in places that will achieve objectives for minimal cost. Two of the main algorithms for solving systematic conservation planning problems are Simulated Annealing (SA) and exact integer linear programing (EILP) solvers. Using a case study in BC, Canada, we compare the cost-effectiveness and processing times of SA used in Marxan versus EILP using both commercial and open-source algorithms. Plans for expanding protected area systems based on EILP algorithms were 12–30% cheaper than plans using SA, due to EILP’s ability to find optimal solutions as opposed to approximations. The best EILP solver we examined was on average 1,071 times faster than the SA algorithm tested. The performance advantages of EILP solvers were also observed when we aimed for spatially compact solutions by including a boundary penalty. One practical advantage of using EILP over SA is that the analysis does not require calibration, saving even more time. Given the performance of EILP solvers, they can be used to generate conservation plans in real-time during stakeholder meetings and can facilitate rapid sensitivity analysis, and contribute to a more transparent, inclusive, and defensible decision-making process.


2016 ◽  
Vol 328 ◽  
pp. 14-22 ◽  
Author(s):  
Hawthorne L. Beyer ◽  
Yann Dujardin ◽  
Matthew E. Watts ◽  
Hugh P. Possingham

2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


Sign in / Sign up

Export Citation Format

Share Document