Optimizing the repair‐time limit replacement schedule with discounting and imperfect repair

2001 ◽  
Vol 7 (1) ◽  
pp. 71-84 ◽  
Author(s):  
T. Dohi ◽  
A. Ashioka ◽  
S. Osaki ◽  
N. Kaio
2003 ◽  
Vol 38 (11-13) ◽  
pp. 1169-1176 ◽  
Author(s):  
Tadashi Dohi ◽  
Akira Ashioka ◽  
Naoto Kaio ◽  
Shunji Osaki

2021 ◽  
Vol 9 (1) ◽  
pp. 176-188
Author(s):  
Haixia Smithson ◽  
Jyotirmoy Sarkar

Allowing several imperfect repairs before a perfect repair can lead to a highly reliable and efficient system by reducing repair time and repair cost. Assuming exponential lifetime and exponential repair time, we determine the optimal probability $p$ of choosing a perfect repair over an imperfect repair after each failure. Based on either the limiting availability or the limiting average repair cost per unit time, we determine the optimal number of imperfect repairs before conducting a perfect repair.


2005 ◽  
Vol 36 (11) ◽  
pp. 717-726 ◽  
Author(s):  
Jae-Hak Lim ◽  
Dae-Kyung Kim ◽  
Dong Ho Park *

2018 ◽  
Vol 2 (1) ◽  
pp. 129
Author(s):  
Novita Dwi Lestari
Keyword(s):  

mafqud is a person who has no news, unknown where it exists, whether alive or dead. Mafqud is one of the reasons for the divorce, which by court verdict contained in article 116 letter b Compilation of Islamic Law (KHI). in addressing mafqud matters KHI provides a limit waiting for 2 years, where as in the school of Shafi'i in qaul jadidnya give time for 90 years, and in his other opinion (qaul qadim) give a time limit for 4 years, then undergo iddah dead for 4 months and 10 days.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


Sign in / Sign up

Export Citation Format

Share Document