ScienceGate
Advanced Search
Author Search
Journal Finder
Blog
Sign in / Sign up
ScienceGate
Search
Author Search
Journal Finder
Blog
Sign in / Sign up
An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem
IEEE Access
◽
10.1109/access.2021.3057366
◽
2021
◽
Vol 9
◽
pp. 26177-26195
Author(s):
Md. Asadujjaman
◽
Humyun Fuad Rahman
◽
Ripon K. Chakrabortty
◽
Michael J. Ryan
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Immune Genetic Algorithm
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
Related Documents
Cited By
References
An Immune Genetic Algorithm for Resource Constrained Project Scheduling Problem with Discounted Cash Flows
2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
◽
10.1109/ieem45057.2020.9309728
◽
2020
◽
Author(s):
Md. Asadujjaman
◽
Humyun Fuad Rahman
◽
Ripon Kumar Chakrabortty
◽
Michael J. Ryan
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Cash Flows
◽
Scheduling Problem
◽
Resource Constrained
◽
Immune Genetic Algorithm
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
A Genetic Algorithm for Solving Resource-Constrained Project Scheduling Problem
Lecture Notes in Computer Science - Advances in Natural Computation
◽
10.1007/11539902_22
◽
2005
◽
pp. 185-193
◽
Cited By ~ 5
Author(s):
Hong Wang
◽
Dan Lin
◽
Minqiang Li
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line
Optimization Letters
◽
10.1007/s11590-020-01542-x
◽
2020
◽
Vol 14
(8)
◽
pp. 2161-2195
Author(s):
Yifei Ren
◽
Zhiqiang Lu
◽
Xinyi Liu
Keyword(s):
Genetic Algorithm
◽
Branch And Bound
◽
Project Scheduling
◽
Assembly Line
◽
Scheduling Problem
◽
Transfer Time
◽
Resource Constrained
◽
Resource Transfer
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
Efficient genetic algorithm for resource-constrained project scheduling problem
Transactions of Tianjin University
◽
10.1007/s12209-010-1495-y
◽
2010
◽
Vol 16
(5)
◽
pp. 376-382
◽
Cited By ~ 6
Author(s):
Hong Wang
◽
Tongling Li
◽
Dan Lin
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
Solving resource-constrained project scheduling problem by genetic algorithm
2014 2nd International Conference on Business and Information Management (ICBIM)
◽
10.1109/icbim.2014.6970966
◽
2014
◽
Cited By ~ 1
Author(s):
Sachin U. Kadam
◽
Narendra S. Kadam
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
Journal of Heuristics
◽
10.1007/s10732-010-9142-2
◽
2010
◽
Vol 17
(5)
◽
pp. 467-486
◽
Cited By ~ 45
Author(s):
José Fernando Gonçalves
◽
Mauricio G. C. Resende
◽
Jorge J. M. Mendes
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
INVESTIGACION & DESARROLLO
◽
10.23881/idupbo.007.1-3e
◽
2007
◽
Vol 7
(1)
◽
pp. 39-50
Author(s):
Edgar Gutiérrez Franco
◽
Fernando La Torre Zurita
◽
Gonzalo Mejía Delgadillo
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
Random Key-Based Genetic Algorithm for Solving Resource Constrained Project Scheduling Problem with Multiple Modes
Intelligent Engineering Systems through Artificial Neural Networks Volume 18
◽
10.1115/1.802823.paper51
◽
2010
◽
pp. 405-412
Author(s):
Ikutaro Okada
◽
Mitsuo Gen
◽
Seren Tasan
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Multiple Modes
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
Non-dominated Sorting Genetic Algorithm-II to solve bi-objective multi-mode resource-constrained project scheduling problem
2013 International Conference on Control, Decision and Information Technologies (CoDIT)
◽
10.1109/codit.2013.6689652
◽
2013
◽
Cited By ~ 2
Author(s):
Najeh Damak
◽
Bassem Jarboui
◽
Taicir Loukil
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Multi Mode
Download Full-text
An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case
European Journal of Operational Research
◽
10.1016/j.ejor.2017.07.027
◽
2018
◽
Vol 265
(2)
◽
pp. 454-462
◽
Cited By ~ 64
Author(s):
Roubila Lilia Kadri
◽
Fayez F. Boctor
Keyword(s):
Genetic Algorithm
◽
Project Scheduling
◽
Single Mode
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Transfer Times
Download Full-text
Sign in / Sign up
Close
Export Citation Format
Close
Share Document
Close