Timing and resource constrained leakage power aware scheduling in high-level synthesis
Keyword(s):
2014 ◽
Vol E97.A
(4)
◽
pp. 940-951
◽
2014 ◽
Vol E97.A
(8)
◽
pp. 1709-1719
◽
2010 ◽
Vol 15
(4)
◽
pp. 1-13
◽
2009 ◽
Vol 3
(1)
◽
pp. 43
◽
Keyword(s):
1995 ◽
pp. 377-388
◽
Keyword(s):