1008 Dynamic Job Shop Scheduling with Consideration to the Due-date Allowance
2006 ◽
Vol 2006.44
(0)
◽
pp. 387-388
2009 ◽
Vol 47
(15)
◽
pp. 4047-4062
◽
2021 ◽
Vol 1848
(1)
◽
pp. 012029
2019 ◽
Vol 51
◽
pp. 100594
◽