4109 A study on a real-time scheduling of Holonic Manufacturing Systems : Determination of effectiveness values based on expectation value of objective function
2005 ◽
Vol 2005
(0)
◽
pp. 53-54
2004 ◽
Vol 70
(700)
◽
pp. 3625-3630
2004 ◽
Vol 2004.79
(0)
◽
pp. _4-17_-_4-18_
2004 ◽
Vol 2004
(0)
◽
pp. 57-58
2006 ◽
Vol 2006
(0)
◽
pp. 33-34
2006 ◽
Vol 2006
(0)
◽
pp. 19-20
2007 ◽
Vol 2007
(0)
◽
pp. 9-10
2008 ◽
Vol 74
(742)
◽
pp. 1662-1668
◽
2006 ◽
Vol 44
(18-19)
◽
pp. 3657-3675
◽
2002 ◽
Vol 2002.77
(0)
◽
pp. _4-27_-_4-28_