Effect of problem size on the performance of constructive algorithms for flow shop scheduling problems with sequence dependent setup times
2014 ◽
Vol 3
(3)
◽
pp. 204
2012 ◽
Vol 67
(5-8)
◽
pp. 1337-1353
◽
1974 ◽
Vol 21
(3)
◽
pp. 515-524
◽
2017 ◽
Vol 29
(1)
◽
pp. 127
2012 ◽
Vol 50
(24)
◽
pp. 7447-7466
◽