An EPQ model with reliability in an imperfect production system at the presence of two sale policies of prepayment and delay in payment

2016 ◽  
Vol 27 (4) ◽  
pp. 530
Author(s):  
Babak Rezezedeh ◽  
Abolfazl Mirzazadeh ◽  
Mohammad Mohammadi
2011 ◽  
Vol 217 (13) ◽  
pp. 6159-6167 ◽  
Author(s):  
Biswajit Sarkar ◽  
Ilkyeong Moon

Sign in / Sign up

Export Citation Format

Share Document