An improved hybrid method for the resource-constrained project scheduling problem with discounted cash flows

2012 ◽  
Vol 7 (1) ◽  
pp. 135-146
Author(s):  
Anikó Csébfalvi ◽  
Blanka Láng
Sign in / Sign up

Export Citation Format

Share Document