Teleseismic slowness-azimuth station corrections for the International Monitoring System Seismic Network

1999 ◽  
Vol 89 (4) ◽  
pp. 989-1003 ◽  
Author(s):  
István Bondár ◽  
Robert G. North ◽  
Gregory Beall

Abstract The prototype International Data Center (PIDC) in Arlington, Virginia, has been developing and testing software and procedures for use in the verification of the Comprehensive Test Ban Treaty. After three years of operation with a global network of array and three-component stations, it has been possible to characterize various systematic biases of those stations that are designated in the Treaty as part of the International Monitoring System (IMS). These biases include deviations of azimuth and slowness measurements from predicted values, caused largely by lateral heterogeneity. For events recorded by few stations, azimuth and slowness are used in addition to arrival-time data for location by the PIDC. Corrections to teleseismic azimuth and slowness observations have been empirically determined for most IMS stations providing data to the PIDC. Application of these corrections is shown to improve signal association and event location. At some stations an overall systematic bias can be ascribed to local crustal structure or to unreported instrumental problems. The corrections have been applied in routine operation of the PIDC since February 1998.

2021 ◽  
Author(s):  
thomas philippe ◽  
sylvain carre

<p>CEA is operating the French segment of the International Monitoring System of the Comprehensive Test Ban Treaty (CTBT). Construction of IMS stations was started on the late 90’ and one last station was pending before completing commitment of France.</p><p>Taking into account experience learned over the years, design was thought to combine enhanced detection capability and robustness. It gives also the opportunity to improve out monitoring tools and technics.</p><p>Station run 9 sensors spread out on a deep forest in Guadeloupe; power is distributed with buried cable while data are received with optical fibre to a central facility from which frames are sent to the International Data Center to the CTBTO. Constructiion was carried out in 2019.</p><p>IS25 was certified by the PTS of the CTBTO in November 2020</p>


Sign in / Sign up

Export Citation Format

Share Document