scholarly journals Experimental and Simulation Analysis of Prestressed Concrete Continuous Box Girder Bridge

2010 ◽  
Vol 163-167 ◽  
pp. 2369-2375 ◽  
Author(s):  
Ming Yuan ◽  
Dong Huang Yan

The stress state of finished bridge and service stage is influenced by various closure schemes in cantilever construction of multi-span prestressed concrete box-girder bridge. Two typical bridges—multi-span prestressed concrete continuous rigid frame bridge and girder bridge are investigated, The stress state in different closure schemes are analyzed using finite element(FE) analysis. Meanwhile, compared the healthy monitoring data, it has been found that taking the closure sequence from side span to middle span in cantilever construction of multi-span prestressed concrete box-girder bridge can lower stress of girder and pier in finished bridge stage, as well as reducing deformation of girder in service stage. Hence, the closure sequence from side span to middle span is more suitable for cantilever construction of multi-span prestressed concrete box-girder bridge.


2012 ◽  
Vol 204-208 ◽  
pp. 2209-2213 ◽  
Author(s):  
Ya Jiang Du ◽  
Bing Wen Yang ◽  
Shui Wan

In the construction of prestressed concrete(PC) box-girder bridge with corrugated steel webs used cast-in-place cantilever method, the key component-corrugated steel webs are fabricated in factory first and then transported to the construction site. Because of the low out-of plane stiffness, corrugated steel webs are easy to deform in the construction, which brings many difficulties for construction. The precision of installing the corrugated steel web has a direct effect on the cross-section shape of the box-girder. So it is a key step to monitor the orientation and installation of corrugated steel web during construction. Based on the experience of some PC box-girder bridges with corrugated steel webs having been built, a method to control the installation accuracy of corrugated steel webs is proposed and some quality assurance measures are introduced in order to ensure the accuracy, reliability and security of the installation of corrugated steel web. The method can be taken as a reference in the construction of this kind of bridge.


2019 ◽  
Vol 19 (4) ◽  
pp. 1051-1063 ◽  
Author(s):  
Hanwei Zhao ◽  
Youliang Ding ◽  
Aiqun Li ◽  
Zhaozhao Ren ◽  
Kang Yang

The monitoring data makes it feasible to quickly evaluate the cracking of the prestressed concrete box-girder bridge. The live-load strain can accurately quantify the load effect and cracking of bridges due to its explicit datum point of signal. Based on the live-load strain data from bridge monitoring system, this study develops a comprehensive data-driven method of state evaluation and cracking early warning for the prestressed concrete box-girder bridge. The feature of vehicle-induced strain is extracted using the deep learning and classification of long short-term memory network. The vehicle-induced strain features are clustered via Gaussian mixture model, and the cracking early warning of the bridge is conducted according to the reliability of heavy vehicle clustering data. This method can be used as an indicator for the bridge inspection, truck-weight-limit and reinforcement work. The results demonstrate that (1) using the long short-term memory network, a deep learning model can be trained to intelligently classify the non-stationary and stationary sections of vehicle-induced strains, of which the test accuracy of classification surpasses 99%, and (2) according to the Gaussian mixture model probability distribution of data, the vehicle-induced strain features can be clustered by the corresponding Gaussian mixture model crest, which is the premise for reflecting relational mapping between vehicle loading and strain response.