concrete box girder
Recently Published Documents


TOTAL DOCUMENTS

341
(FIVE YEARS 70)

H-INDEX

20
(FIVE YEARS 3)

Structures ◽  
2022 ◽  
Vol 35 ◽  
pp. 591-607
Author(s):  
Chenzhi Cai ◽  
Shiji Huang ◽  
Xuhui He ◽  
Tieming Zhou ◽  
Yunfeng Zou

Author(s):  
Zeying Yang ◽  
Yinglin Sun ◽  
Chenghe Wang ◽  
Zhengquan Cheng ◽  
Tianmin Wang ◽  
...  

2021 ◽  
Vol 2083 (4) ◽  
pp. 042051
Author(s):  
Xianggang Wang ◽  
Yongli Shen ◽  
Yongcheng Yang ◽  
Xinxin Zhou ◽  
Gangnian Xu ◽  
...  

Abstract Dongming Yellow River Highway Bridge is an important super large bridge across the Yellow River on national highway 106. In order to effectively improve the cracking and deflection of the bridge, the cable-stayed system is used to reinforce the main girder of the project. In order to analyze the stress state of joist, bracket and box girder, the static loading of cable is carried out through scale model test to study the mechanical properties of concrete box girder segment, joist and bracket, verify the reliability of bracket and concrete box girder anchorage, and optimize the reinforcement method of cable-stayed system according to the test results.


Sign in / Sign up

Export Citation Format

Share Document