scholarly journals Preliminary analysis of projected construction employment effects of building the defense waste processing facility at the Savannah River Plant

1981 ◽  
Author(s):  
R. B. Garey ◽  
L. M. Blair ◽  
R. L. Craig ◽  
W. Stevenson
1984 ◽  
Vol 44 ◽  
Author(s):  
Daniel C. Iverson ◽  
Dennis F. Bickford

AbstractThe Large Slurry Fed Melter (LSFM) at the Department of Energy's Savannah River Plant recently completed two years of service and was shut down for evaluation. The melter operating history is reviewed and the condition of the refractories and metal components is described. The excellent condition of the LSFM verifies the expected performance of the materials of construction, and indicates that a two year melter life is achievable in the Defense Waste Processing Facility (DWPF).


Sign in / Sign up

Export Citation Format

Share Document