A LIFE CYCLE INVENTORY ANALYSIS OF CARBON DIOXIDE FOR A HIGHWAY CONSTRUCTION PROJECT USING INPUT-OUTPUT SCHEME A CASE STUDY OF THE TOHOKU EXPRESSWAY CONSTRUCTION WORKS
1999 ◽
Vol 16
◽
pp. 411-418
◽
2004 ◽
Vol 9
(6)
◽
pp. 365-370
◽
Keyword(s):
Keyword(s):
Keyword(s):
2014 ◽
Vol 79
◽
pp. 152-167
◽
Keyword(s):
2008 ◽
Vol 4
(1)
◽
pp. 78-88
◽