scholarly journals The Heuristic Methods for Assembly Line Balancing Problem: A Case of Vietnam Garment Industry

Author(s):  
Ho Quoc Dung
2013 ◽  
Vol 816-817 ◽  
pp. 1169-1173
Author(s):  
Usman Attique ◽  
Abdul Ghafoor ◽  
Riaz Ahmed ◽  
Shahid Ikramullah

Various exact and heuristic methods have been proposed for assembly line balancing problem (ALBP) but unequal multiple operators have not been considered much. In this paper we present a novel approach of assembly line balancing Type-2 with unequal multiple operators by using an already developed code in Matlab (Tomlab modeling platform). The adopted approach can be applied at line balancing problems ranging from few to hundreds of work elements to achieve minimum cycle time with very less computational effort.


Author(s):  
Nurhanani Abu Bakar ◽  
Mohammad Fadzli Ramli ◽  
Mohd Zakimi Zakaria ◽  
Tan Chan Sin ◽  
Hafiz Masran

<p>Currently, problem in assembly line has created so much attention, particularly in manufacturing area. Similar to this case study as they faced with problems regarding workstation in production line of electrical industry. There exist some cases where workstations in assembly line are experienced with bottleneck and suffered from high idle time. Thus, four heuristic methods are used for minimizing number or workstations and improve the bottleneck problems at the same time. In this case study, LCR, RPW and LPT have successfully minimized the number of workstations from 19 to 16. This solution has affected the layout of assembly line. Different from SPT that manage to improve the bottleneck among workstations by reducing number of workstations from 19 to 17 without changing the line layout. Therefore, both solution has brought an option for an engineer to choose which decision to be used in this assembly line in order to increase the line efficiency.</p>


Sign in / Sign up

Export Citation Format

Share Document