scholarly journals Robust Optimization Model of Project Scheduling Problem Based on Genetic Algorithm

Author(s):  
Dayong Wang ◽  
Xiangyang Li ◽  
Bingxiu Fang ◽  
Jinling Chou
2013 ◽  
Vol 483 ◽  
pp. 607-610 ◽  
Author(s):  
Chun Jie Zhong ◽  
Ying Yu ◽  
Yun Lang Jia

A resource-constrained project scheduling problem with stochastic resource-dependent activity durations is presented in this paper,and the two-point method is employed to simulate the uncertain property.Furthermore a genetic algorithm combined with this method is provided to solve the problem. Compared with the results from the genetic with Monte Carlo simulation, the proposed method is verified to be effective and more efficient.


Sign in / Sign up

Export Citation Format

Share Document