Benchmarking for construction management process reengineering

Author(s):  
M.-Y. Cheng ◽  
M.-H. Tsai ◽  
W. Sutan
2018 ◽  
Vol 193 ◽  
pp. 05051
Author(s):  
Fjoder Klashanov

The article is devoted to analysis of data mining techniques in a model of construction management. In the construction industry, as a rule, in most cases is incomplete and/or unclear information, so the classical methods of model-building control don't work. In this case, it is advisable to apply some well developed methods of fuzzy sets and fuzzy logic. The original construction is described by the words of the spoken language, where the sentences are predicates of the first kind. Identifies the parameters that influence the management process in the form of a lexical variable, which is analyzed by methods of the theory of many-valued logic. The results of the analysis are used in building the model administration of construction.


2009 ◽  
Vol 18 (5) ◽  
pp. 605-623 ◽  
Author(s):  
Min-Yuan Cheng ◽  
Ming-Hsiu Tsai ◽  
Wiraputra Sutan

Sign in / Sign up

Export Citation Format

Share Document