A Bat Algorithm with Generalized Walk for the Two-Stage Hybrid Flow Shop Problem

Author(s):  
Latifa Dekhici ◽  
Khaled Belkadi

In the last years, a set of bio-inspired metaheuristics has proved their efficiencies in combinational and continues optimization areas. This paper intends to hybrid a discrete version of Bat Algorithm (BA) with Generalized Evolutionary Walk Algorithm (GEWA) to solve the mono-processors two stages Hybrid Flow Shop scheduling. The authors compare the modified bat algorithm with the original one, with Particle Swarm Optimization (PSO) and with others results taken from literature. Computational results on a standard two-stage hybrid flow shop benchmark of 70 cases, and about 1700 instances, indicate that the proposed algorithm finds the best makespan (Cmax) in a good processing time comparing to the original bat algorithm and other algorithms.

2013 ◽  
Vol 651 ◽  
pp. 548-552
Author(s):  
Parinya Kaweegitbundit

This paper considers two stage hybrid flow shop (HFS) with identical parallel machine. The objectives is to determine makespan have been minimized. This paper presented memetic algorithm procedure to solve two stage HFS problems. To evaluated performance of propose method, the results have been compared with two meta-heuristic, genetic algorithm, simulated annealing. The experimental results show that propose method is more effective and efficient than genetic algorithm and simulated annealing to solve two stage HFS scheduling problems.


2012 ◽  
Vol 252 ◽  
pp. 354-359
Author(s):  
Xin Min Zhang ◽  
Meng Yue Zhang

A main-branch hybrid Flow shop scheduling problem in production manufacturing system is studied. Under the premise of JIT, targeting of smallest cost, a Flow-Shop production line scheduling model is built in cycle time of buffer. Two stages Quantum Genetic Algorithm (QGA) is proposed. By the results of numerical example, the effective and advantageous of QGA was shown.


2015 ◽  
Vol 766-767 ◽  
pp. 962-967
Author(s):  
M. Saravanan ◽  
S. Sridhar ◽  
N. Harikannan

The two-stage Hybrid flow shop (HFS) scheduling is characterized n jobs m machines with two-stages in series. The essential complexities of the problem need to solve the hybrid flow shop scheduling using meta-heuristics. The paper addresses two-stage hybrid flow shop scheduling problems to minimize the makespan time with the batch size of 100 using Genetic Algorithm (GA) and Simulated Annealing algorithm (SA). The computational results observed that the GA algorithm is finding out good quality solutions than SA with lesser computational time.


Sign in / Sign up

Export Citation Format

Share Document