A Genetic Algorithm for The Critical Chain Project Scheduling Problem

Author(s):  
Peng Wuliang ◽  
Su Hui ◽  
Hao Yongping
2013 ◽  
Vol 483 ◽  
pp. 607-610 ◽  
Author(s):  
Chun Jie Zhong ◽  
Ying Yu ◽  
Yun Lang Jia

A resource-constrained project scheduling problem with stochastic resource-dependent activity durations is presented in this paper,and the two-point method is employed to simulate the uncertain property.Furthermore a genetic algorithm combined with this method is provided to solve the problem. Compared with the results from the genetic with Monte Carlo simulation, the proposed method is verified to be effective and more efficient.


Sign in / Sign up

Export Citation Format

Share Document