ScienceGate
Advanced Search
Author Search
Journal Finder
Blog
Sign in / Sign up
ScienceGate
Search
Author Search
Journal Finder
Blog
Sign in / Sign up
A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem with Strip Packing like Resource Constraints
Proceedings of the Seventh International Conference on Engineering Computational Technology
◽
10.4203/ccp.94.93
◽
2010
◽
Author(s):
E. Szendroi
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Resource Constraints
◽
Scheduling Problem
◽
Strip Packing
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Multi Mode
Download Full-text
Related Documents
Cited By
References
A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and Strip Packing like Resource Constraints
Proceedings of the Seventh International Conference on Engineering Computational Technology
◽
10.4203/ccp.94.92
◽
2010
◽
Author(s):
B. Láng
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Resource Constraints
◽
Cash Flows
◽
Scheduling Problem
◽
Strip Packing
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Hammock Activities and Strip Packing like Resource Constraints
Proceedings of the Seventh International Conference on Engineering Computational Technology
◽
10.4203/ccp.94.91
◽
2010
◽
Author(s):
O. Eliezer
◽
R. Levi
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Resource Constraints
◽
Scheduling Problem
◽
Strip Packing
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem
Proceedings of the First International Conference on Soft Computing Technology in Civil, Structural and Environmental Engineering
◽
10.4203/ccp.92.3
◽
2009
◽
Author(s):
E. Szendroi
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Multi Mode
Download Full-text
An Improved Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem
Proceedings of the Eighth International Conference on Engineering Computational Technology
◽
10.4203/ccp.100.50
◽
2012
◽
Author(s):
A. Csébfalvi
◽
E. Szendroi
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Multi Mode
Download Full-text
Robust Optimization Based Heuristic Approach for Solving Stochastic Multi-Mode Resource Constrained Project Scheduling Problem
2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
◽
10.1109/ieem45057.2020.9309878
◽
2020
◽
Author(s):
R. K. Chakrabortty
◽
M. J. Ryan
Keyword(s):
Robust Optimization
◽
Project Scheduling
◽
Heuristic Approach
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Multi Mode
Download Full-text
An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
European J of Industrial Engineering
◽
10.1504/ejie.2017.089101
◽
2017
◽
Vol 11
(6)
◽
pp. 774
◽
Cited By ~ 2
Author(s):
Patrick Gerhards
◽
Christian Stürck
◽
Andreas Fink
Keyword(s):
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Neighbourhood Search
◽
Large Neighbourhood
◽
Project Scheduling Problem
◽
Adaptive Large Neighbourhood Search
◽
Multi Mode
◽
Large Neighbourhood Search
Download Full-text
A robust hybrid method for the resource-constrained project scheduling problem with discounted cash flows
Pollack Periodica
◽
10.1556/pollack.5.2010.3.14
◽
2010
◽
Vol 5
(3)
◽
pp. 167-174
◽
Cited By ~ 5
Author(s):
Blanka Láng
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Cash Flows
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
The multi-mode, resource-constrained project scheduling problem in construction: state of art review and research challenges
Czasopismo Techniczne
◽
10.4467/2353737xct.17.070.6427
◽
2017
◽
Vol 5
◽
Cited By ~ 2
Keyword(s):
Project Scheduling
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Research Challenges
◽
Project Scheduling Problem
◽
Multi Mode
◽
State Of Art
Download Full-text
A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags
Algorithms
◽
10.3390/a9040063
◽
2016
◽
Vol 9
(4)
◽
pp. 63
◽
Cited By ~ 1
Author(s):
Angela Chen
◽
Yun-Chia Liang
◽
Jose Padilla
Keyword(s):
Project Scheduling
◽
Execution Time
◽
Time Frame
◽
Time Lags
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
◽
Multi Mode
◽
Maximal Time
Download Full-text
A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows
Proceedings of the First International Conference on Soft Computing Technology in Civil, Structural and Environmental Engineering
◽
10.4203/ccp.92.2
◽
2009
◽
Cited By ~ 2
Author(s):
B. Láng
Keyword(s):
Hybrid Method
◽
Project Scheduling
◽
Cash Flows
◽
Scheduling Problem
◽
Resource Constrained
◽
Resource Constrained Project Scheduling
◽
Project Scheduling Problem
Download Full-text
Sign in / Sign up
Close
Export Citation Format
Close
Share Document
Close