scholarly journals The Impact of Micro-Hydro Power Plants in Increasing the Welfare of Rural Residents: A Case Study of Badakhshan Province- Afghanistan

Author(s):  
Jamshid YOLCHİ ◽  
Farzad AHMADİ
2017 ◽  
Vol 141 ◽  
pp. 352-359 ◽  
Author(s):  
Daniel Adu ◽  
Jinfeng Zhang ◽  
Yujian Fang ◽  
Lv Suoming ◽  
Ransford O. Darko

2018 ◽  
Vol 67 ◽  
pp. 04027
Author(s):  
Muhammad Ilham Maulana ◽  
Ahmad Syuhada ◽  
Fiqih Almas

One of the alternative solutions to reduce the impact of electricity crisis in Aceh and other isolated areas in Indonesia is by the construction of small-scale hydro power plants that can work efficiently on the heads lower than 10 meters. One suitable type of turbine applied to the head below 10 meters is the Archimedes screw turbine. Due to the lack of information about the application of low head power plants, resulting in applications of this type of turbine is still less in Indonesia. This paper examined the appropriate turbine model. Before experimental turbine testing, turbines were designed theoretically first and then analyzed numerically. The flow velocity and pressure patterns within the turbine were analyzed using ANSYS CFD (Computational Fluid Dynamic) software under design conditions for 7, 9 and 11 screw numbers for single blade turbine. Based on the results of pressure analysis, speed and turbulent kinetic energy, it found that turbine performance using 11 blades is better among the three turbines. However, the highest average speed was obtained on the turbine using 7 screws, which maximum pressure obtained on a turbine 7 screws of 1406 Pa, on 9 screws on plane 1301 Pa and at 11 screws of 1175 Pa. Based on the results of the analysis, it showed that the smaller the distance between the channel and turbine blades, the results were more efficient due to the absence of wasted streams. Therefore, the flow pressure in the inlet position all directly leaded to the tip off the blade to produce a momentum.


Author(s):  
Elga Apsîte ◽  
Didzis Elferts ◽  
Inese Latkovska

Abstract This paper presents the results of the study of long-term changes of Daugava River ice phenology, i.e. the freeze-up date, the break-up date, and the duration of ice cover from 1919/1920 to 2011/2012, under the impact of the cascade of hydro power plants. The long-term changes of ice phenology were determined by global climate warming at the turn of the 20th and the 21st centuries and anthropogenic activities after the year 1939. The Mann-Kendall test showed that the ice freeze-up date has a positive trend, while the ice break-up date and the duration of ice cover had negative trends. The changes were statistically significant. Data series covering twenty years before and after construction of the hydro power plants were used for assessing the impact of each hydro power plant on changes of Daugava River ice phenology parameters. The study results showed that the duration of ice cover was significantly longer in water reservoirs, i.e. the freeze-up date was earlier and the break-up date was later. Downstream of dams duration of ice cover was shorter with later freeze-up dates and earlier break-up dates. The impact of hydro power plants on ice phenology parameters gradually decreased with distance down from the dams.


Sign in / Sign up

Export Citation Format

Share Document