Customer Order Acceptance and Due Date Setting in Make-to-Order Manufacturing

2013 ◽  
Vol 694-697 ◽  
pp. 3446-3452 ◽  
Author(s):  
Horng Huei Wu ◽  
Ming Feng Li ◽  
Tzu Fang Hsu

The LED chip manufacturing (LED-CM) is an important process in the LED supply chain. The make-to-order production strategy is a general production model for the LED-CM plants to satisfy the variety requirement of their customers. However, the special features of the unstable production output and a product composed of the chips of different feasible Bins exist in the LED-CM plant. The production planner will confront the issue of effective inventory control and exact due-date performance under the severely competitive pressure. Therefore an effective order fulfillment procedure for production planners is a required key issue to accomplish the inventory control and exact due-date performance. An order fulfillment model for production planner is thus proposed in this paper to meet the requirement of the LED-CM plants. A real-life LED-CM case is also utilized to demonstrate and evaluate the application and effectiveness of the proposed model.


2021 ◽  
Vol 1 (2) ◽  
pp. 46-51
Author(s):  
Dwi Ayu Lestari, Vikha Indira Asri

Scheduling is defined as the process of sequencing the manufacture of a product as a whole on several machines. All industries need proper scheduling to manage the allocation of resources so that the production system can run quickly and precisely as of it can produce optimal product. PT. Sari Warna Asli Unit V is one of the companies that implements a make to order production system with the FCFS system. Thus, scheduling the production process at this company is also known as job shop production scheduling. The methods used in this research are the CDS method, the EDD method and the FCFS method. The purpose of this research is to minimize the production time and determine the best method that can be applied to the company. The results of this research showed that the makespan obtained in the company's scheduling system with FCFS rules was 458 minutes, and the results of scheduling using the CDS method obtained a makespan value of 329 minutes, then the best production scheduling method that had the smallest makespan value was the CDS method.


2008 ◽  
Vol 55 (5) ◽  
pp. 444-458 ◽  
Author(s):  
Philip Kaminsky ◽  
Onur Kaya

2010 ◽  
Vol 125 (1) ◽  
pp. 200-211 ◽  
Author(s):  
Ceyda Og˘uz ◽  
F. Sibel Salman ◽  
Zehra Bilgintürk Yalçın