A computational comparison of 2 mathematical formulations to handle transmission network constraints in the unit commitment problem

2017 ◽  
Vol 27 (8) ◽  
pp. e2332 ◽  
Author(s):  
Victor H. Hinojosa ◽  
Guillermo Gutiérrez-Alcaraz
Energies ◽  
2018 ◽  
Vol 11 (9) ◽  
pp. 2232 ◽  
Author(s):  
Guillermo Gutierrez-Alcaraz ◽  
Victor Hinojosa

This study proposes a mixed-integer linear programming (MILP) model to figure out the transmission-constrained direct current (DC)-based unit commitment (UC) problem using the generalized generation distribution factors (GGDF) for modeling the transmission network constraints. The UC problem has been reformulated using these linear distribution factors without sacrificing optimality. Several test power systems (PJM 5-bus, IEEE-24, and 118-bus) have been used to validate the introduced formulation. Results demonstrate that the proposed approach is more compact and less computationally burdensome than the classical DC-based formulation, which is commonly employed in the technical literature to carry out the transmission network constraints. Therefore, there is a potential applicability of the accomplished methodology to carry out the UC problem applied to medium and large-scale electrical power systems.


2017 ◽  
Vol 10 (4) ◽  
pp. 13
Author(s):  
TIWARI SHUBHAM ◽  
DWIVEDI BHARTI ◽  
DAVE M.P. ◽  
◽  
◽  
...  

2009 ◽  
Vol 29 (4) ◽  
pp. 1028-1031
Author(s):  
Wei-xin GAO ◽  
Xiang-yang MU ◽  
Nan TANG ◽  
Hong-liang YAN

Author(s):  
Ayani Nandi ◽  
Vikram Kumar Kamboj

AbstractConventional unit commitment problem (UCP) consists of thermal generating units and its participation schedule, which is a stimulating and significant responsibility of assigning produced electricity among the committed generating units matter to frequent limitations over a scheduled period view to achieve the least price of power generation. However, modern power system consists of various integrated power generating units including nuclear, thermal, hydro, solar and wind. The scheduling of these generating units in optimal condition is a tedious task and involves lot of uncertainty constraints due to time carrying weather conditions. This difficulties come to be too difficult by growing the scope of electrical power sector day by day, so that UCP has connection with problem in the field of optimization, it has both continuous and binary variables which is the furthermost exciting problem that needs to be solved. In the proposed research, a newly created optimizer, i.e., Harris Hawks optimizer (HHO), has been hybridized with sine–cosine algorithm (SCA) using memetic algorithm approach and named as meliorated Harris Hawks optimizer and it is applied to solve the photovoltaic constrained UCP of electric power system. In this research paper, sine–cosine Algorithm is used for provision of power generation (generating units which contribute in electric power generation for upload) and economic load dispatch (ELD) is completed by Harris Hawks optimizer. The feasibility and efficacy of operation of the hybrid algorithm are verified for small, medium power systems and large system considering renewable energy sources in summer and winter, and the percentage of cost saving for power generation is found. The results for 4 generating units, 5 generating units, 6 generating units, 7 generating units, 10 generating units, 19 generating units, 20 generating units, 40 generating units and 60 generating units are evaluated. The 10 generating units are evaluated with 5% and 10% spinning reserve. The efficacy of the offered optimizer has been verified for several standard benchmark problem including unit commitment problem, and it has been observed that the suggested optimizer is too effective to solve continuous, discrete and nonlinear optimization problems.