Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost
Keyword(s):
2014 ◽
Vol 52
(19)
◽
pp. 5611-5625
◽
A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems
1993 ◽
Vol 70
(3)
◽
pp. 327-334
◽
2013 ◽
Vol 13
(4)
◽
pp. 409
Keyword(s):
Keyword(s):
2004 ◽
Vol 47
(2)
◽
pp. 96-111
◽
Keyword(s):
2004 ◽
Vol 25
(9-10)
◽
pp. 1046-1052
◽
2006 ◽
Vol 57
(4)
◽
pp. 410-415
◽
Keyword(s):
2012 ◽
Vol 63
(4)
◽
pp. 567-567
◽
Keyword(s):
2014 ◽
Vol 74
◽
pp. 102-110
◽
Keyword(s):
Keyword(s):