A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time
2019 ◽
Vol 145
(3)
◽
pp. 04018142
◽
2017 ◽
Vol 16
(3)
◽
pp. 271-287
◽
2015 ◽
Vol 30
(11)
◽
pp. 872-891
◽
1998 ◽
Vol 25
(1)
◽
pp. 1-17
◽
1998 ◽
Vol 111
(1)
◽
pp. 152-174
◽
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
1999 ◽
Vol 119
(2)
◽
pp. 538-556
◽
2011 ◽
Vol 38
(1)
◽
pp. 14-20
◽
2011 ◽
Vol 25
(1-2)
◽
pp. 6-24
◽
Keyword(s):