A new approach to computing optimal schedules for the job-shop scheduling problem

Author(s):  
Paul Martin ◽  
David B. Shmoys
2015 ◽  
Vol 760 ◽  
pp. 199-204
Author(s):  
Mircea Gorgoi ◽  
Corneliu Neagu

In generally scheduling can be viewed as optimization, bound by sequence and resource constrain and the minimization of the makespan is often used as the criterion. In this paper minimization of the makespan or complete time will be used such as an objective function and not the criterion of the decision. The new approach use heuristic elementary priority dispatch rules as the criterion of the decision. This research purpose a new methodology which use a specific elements of PERT techniques to find the optimum solution. New approach establish a solution's space where are find the all solution of the problem. Determination of the solution's space is realized by a meta-algorithm which take in account all the variant of the solutions of the process.


2011 ◽  
Vol 21 (12) ◽  
pp. 3082-3093
Author(s):  
Zhu-Chang XIA ◽  
Fang LIU ◽  
Mao-Guo GONG ◽  
Yu-Tao QI

Sign in / Sign up

Export Citation Format

Share Document