2014 ◽  
Vol 1004-1005 ◽  
pp. 1464-1467
Author(s):  
Xiu Li

Introduced the essential construction craft of Nanchang Shengmi bridge (75+2×228+75m center bearing type steel tube concrete tie bar arched bridge). According to the construction craft and the quality specification request, discussed the steel arched bridge manufacture and the anticorrosion, the steel arched bridge rib erects, the steel arched bridge rib welding, the steel arched bridge in concrete configuration and the scene constructs, the steel tube protection coating construction, then proposed the construction quality control of large span steel tube concrete arch bridge. The conclusion of the article may be used at the similar steel tube concrete arched bridge construction.


2013 ◽  
Vol 405-408 ◽  
pp. 3086-3089
Author(s):  
Wen Jie Zeng ◽  
Si Qi Yang

The construction of integral hoisting of arch rib of concrete filled steel tube arch bridge has the advantages of simple process, easy quality control, small safety risk and not affecting the river navigation, etc. This paper introduces the construction method of arch rib assembly and arch rib large segment hoisting.


2003 ◽  
Vol 118 (3) ◽  
pp. 193-196 ◽  
Author(s):  
Jeffrey W McKenna ◽  
Terry F Pechacek ◽  
Donna F Stroup

1971 ◽  
Vol 127 (1) ◽  
pp. 101-105 ◽  
Author(s):  
L. L. Weed

2009 ◽  
Author(s):  
Morris Goldsmith ◽  
Larry L. Jacoby ◽  
Vered Halamish ◽  
Christopher N. Wahlheim

1956 ◽  
Vol 35 (8) ◽  
pp. 504
Author(s):  
Bernard P. Dudding
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document