The Quality Control on Shengmi Bridge Arch Rib Construction
2014 ◽
Vol 1004-1005
◽
pp. 1464-1467
Keyword(s):
Introduced the essential construction craft of Nanchang Shengmi bridge (75+2×228+75m center bearing type steel tube concrete tie bar arched bridge). According to the construction craft and the quality specification request, discussed the steel arched bridge manufacture and the anticorrosion, the steel arched bridge rib erects, the steel arched bridge rib welding, the steel arched bridge in concrete configuration and the scene constructs, the steel tube protection coating construction, then proposed the construction quality control of large span steel tube concrete arch bridge. The conclusion of the article may be used at the similar steel tube concrete arched bridge construction.
2013 ◽
Vol 351-352
◽
pp. 1240-1243
◽
2013 ◽
Vol 321-324
◽
pp. 259-263
2013 ◽
Vol 639-640
◽
pp. 1025-1028
2014 ◽
Vol 501-504
◽
pp. 1390-1397
Keyword(s):