An Integrated Hesitant Fuzzy Decision Model for Sustainable Wind Farm Site Selection: The Case Study in the Central Anatolian Region of Turkey

Author(s):  
Beyzanur Cayir Ervural
1993 ◽  
Vol 53 (3) ◽  
pp. 241-252 ◽  
Author(s):  
J. Davidson ◽  
W. Pedrycz ◽  
I. Goulter

2015 ◽  
Vol 11 (2) ◽  
pp. 97-115 ◽  
Author(s):  
S. Haseen ◽  
A. Bari

Abstract In this paper, a likely situation of a set of decision maker’s with bi-objectives in case of fuzzy multi-choice goal programming is considered. The problem is then carefully formulated as a bi-objective bilevel programming problem (BOBPP) with multiple fuzzy aspiration goals, fuzzy cost coefficients and fuzzy decision variables. Using Ranking method the fuzzy bi-objective bilevel programming problem (FBOBPP) is converted into a crisp model. The transformed problem is further solved by adopting a two level Stackelberg game theory and fuzzy decision model of Sakawa. A numerical with hypothetical values is also used to illustrate the problem.


2015 ◽  
Vol 109 ◽  
pp. 17-28 ◽  
Author(s):  
Abdolvahhab Fetanat ◽  
Ehsan Khorasaninejad

Sign in / Sign up

Export Citation Format

Share Document