In order to improve the efficiency of the handling operations equipment in container terminal, reduce the waiting time of container ship in Port, this paper researches the integrated scheduling of the different types of handling equipment in container terminal, considers the constraints of different handling equipment impact between each other, build a mixed integer programming model, presents a heuristic algorithm for the of the scheduling problem and gets the approximate solution. The results show that the integrated scheduling can effectively reduce the time of the ship staying in port, and improve the overall operating efficiency of the port.